The OrthoSon project centred on a defined package of furniture, storage and redecoration in the existing lab. For similar projects, early confirmation of what stays, what moves and which areas are available can help protect programme. Furniture drawings and delivery dates should align with site access and the sequence of work.
- Survey the existing room and verify dimensions before ordering.
- Coordinate work with users who need to protect equipment or samples.
- Agree the condition and handover checks expected at completion.
The published case study provides the project facts and client testimonial. Each refurbishment still needs its own survey, scope and programme.
The case study records a specific three-week project and should not be read as a standard programme for every refurbishment. Existing services, furniture lead times, site access and the scope of redecoration all affect duration. A survey and agreed schedule are needed to establish a realistic plan for each laboratory.
If your R&D laboratory needs a targeted refresh or wider refurbishment, ParkLaine can help develop the brief and delivery approach. Explore our laboratory design and consultancy service or contact the team to discuss your facility.