A control strategy needs to remain connected to actual production. New products, equipment, cleaning agents or process changes can affect assumptions made during design. The organisation should have a route for reviewing changes with quality, engineering and operations before the facility or shared systems are altered.
- Confirm which rooms, equipment and services are shared.
- Record the cleaning and release steps between different product campaigns.
- Review proposed process changes for effects on flows, extraction and room relationships.
Design can support these controls with accessible layouts and coordinated services, but day-to-day procedures and GMP decisions remain with the operator and its quality system.
The project brief should also define the information needed to approve room changes. This may include updated process maps, equipment lists, cleaning provisions and service changes. Having an agreed review route helps the organisation determine whether a proposed change affects its existing control strategy before that change is made.
ParkLaine’s pharmaceutical design work brings space planning, equipment and building services together around the agreed brief. Explore our laboratory design and consultancy service or contact our team to discuss a multi-product facility.